Treasure Lane Project Update: Luxury Waterfront Home Reaches New Heights in Treasure Island, Florida
The Treasure Lane Project in Treasure Island, Florida, is reaching an exciting new stage of construction! What began with site preparation, deep foundation work, and the installation of structural pilings is now transfo
Oct 22


Breakwater Build Update: Roof Trusses Going Up as Waterfront Custom Home Takes Shape
What started as an empty waterfront lot following demolition has transformed into an impressive two-story structure. The team at Talica Design | Build continues making significant progress on this custom coastal home, with concrete block walls reaching their planned heights
Oct 22


Axiom Project Construction Update: Innovative Super Floor System Takes Shape
Exciting progress continues at the Axiom Project, where Talica Design | Build is taking another major step forward in constructing this beautiful custom waterfront home. Our latest construction milestone features the installation of the innovative Super Floor System, an advanced
Oct 22


APeX Center Construction Update: Final Concrete Tie Beam Pour Marks Another Major Milestone
Another exciting milestone is taking shape at the APeX Center as Talica Design | Build continues making significant progress on this commercial construction project in St. Petersburg, Florida. Today, crews were hard at work pouring concrete for the final tie beam, an important step in completing this phase of the building's structural framework. From the extensive foundation work and massive concrete slab pour to the construction of exterior walls and cast-in-place concrete s
Oct 20


Custom Home Completed in St. Petersburg, FL | Talica Design | Build
There’s nothing quite like seeing a custom home go from an idea on paper to a completely finished space.
Talica Design | Build has officially wrapped up construction on another beautiful custom-built home, and we’re excited
Sep 22


APeX Center Construction Update: Forming the Cast-in-Place Concrete Structure
Progress continues at the APeX Center, and this phase is an exciting one. The project is now moving into the forming of the cast-in-place concrete structure, bringing another major step forward in the construction process.
Aug 28


Florafête Is Blooming in Downtown St. Pete | New Boutique Build-Out Begins
Something exciting is beginning to bloom in Downtown St. Petersburg! Talica Design | Build is excited to officially kick off a brand-new commercial build-out for Florafête, a beautiful new flower boutique coming soon to the heart of downtown St. Pete. Demo Is Almost Complete. Every transformation starts by making room for something new, and right now our team is wrapping up the demolition phase inside the future Florafête space. The existing interior is being cleared and prep
Aug 17


Breakwater Build Update: Concrete Slab Pour Underway
Another major milestone is happening today at the Breakwater Build as the Talica Design | Build team pours the concrete slab for the new home. Following demolition, site preparation, excavation, and the completion of the concrete footers, the project is now ready for the slab that will form the main base of the home. Preparing for the Concrete Slab Before a slab can be poured, several important steps must be completed beneath the surface. The area must be properly graded and
Jul 31


Treasure Lane Project Update: Walls Are Going Up on This Luxury Treasure Island Home
Located in the heart of Treasure Island, this custom spec home is being built with quality craftsmanship, modern coastal design, and attention to every detail.
Jul 31


The Axiom Project: Walls Are Going Up
Exciting progress is underway at the Axiom Project as the walls begin to rise and this custom home starts taking shape. Follow along as Talica Design | Build brings the vision to life through quality craftsmanship, careful planning, and every new stage of construction.
Jul 31


APeX Center Update: Exterior Walls Are Going Up
The APeX Center is taking another exciting step forward as the exterior walls begin going up on-site. After the early morning concrete slab pour and the completion of major foundation work, this next phase brings a whole new level of progress to the project. What once looked like a prepared construction site is now beginning to take real shape as the building’s exterior walls rise from the slab. The APeX Center Is Starting to Take Shape This stage is always one of the most ex
Jul 18


Breakwater Build Footer Pour: Building a New Home on a Foundation of Faith.
The Breakwater Build has officially reached another major milestone. After completing the demolition of the previous home and preparing the property for new construction, the Talica Design | Build team has now excavated the footers for the new residence. Today, concrete is being poured to create the structural foundation that will support the home for years to come. What Is a Concrete Footer? Concrete footers are one of the most important parts of any new construction project
Jul 13


APeX Center Construction Update: Over 10,000 Square Feet of Concrete Poured
At 3:00 AM, while most of St. Petersburg was still asleep, the job site at the APeX Center came to life.
Crews arrived before sunrise, lights came on, concrete trucks started rolling in,
Jun 24


APeX Center Update: Ready for the Early Morning Slab Pour
Exciting progress continues at the PYCC Wellness Center as we prepare for one of the biggest milestones of the project so far.
Jun 22


The Bali House Reaches New Heights
Progress continues to move quickly at The Bali House, and this custom home is already beginning to take shape.
Since our last update, the structure has risen another level as the team continues building the exterior block walls.
Jun 22


The Axiom Project Reaches a Major Milestone: Slab Pour Day
Exciting progress is underway at the Axiom Project as the Talica Design | Build team reaches another major construction milestone. Today, crews were on site pouring the concrete slab that will serve as the foundation for this future custom home. Using a concrete pumping truck and working with precision throughout the day, the team carefully placed and finished concrete while coordinating every step of the process. A slab pour is one of the most important stages of any build.
Jun 19


APeX Center Update: Infrastructure Taking Shape Beneath the Foundation
With under-slab utilities being completed and concrete overhang forms taking shape, the project is rapidly approaching the next major phase of construction. Each step brings the APeX Center closer to becoming a modern destinatio
Jun 18


The Treasure Lane Project Begins on Treasure Island
Talica Design | Build officially begins The Treasure Lane Project in Treasure Island with wood piling installation for a brand-new luxury waterfront spec home. Follow along as this exciting coastal custom home build takes shape from the ground up.
May 13


Building Progress Continues: Stem Wall Construction Underway at the APeX Center
The transformation of the new wellness center at Pasadena Yacht & Country Club is continuing to take shape as another major construction milestone has officially begun. Talica Design | Build is proud to share the latest progress from the APeX Center project, where stem wall construction is now underway.
May 1


Building the Future of St. Petersburg with Talica Design | Build
At Talica Design | Build, every project starts with a vision, and ends with a structure built to last. As a premier design-build firm based in St. Petersburg, Florida, Talica specializes in custom new construction, delivering high-quality homes and commercial spaces tailored to each client’s lifestyle and goals. A Smarter Approach to Construction Unlike traditional builders, Talica operates through a streamlined design-build process, giving clients a seamless experience from
Apr 21